Agreed loans

Loans disclosed here do not include green bond investments or individual allocations of lending facilities placed with intermediary institutions. For loans in currencies other than EUR, the equivalent in EUR is approximate and based on the exchange rate effective for the signing.

Customer testimonials

Click here

 
Year
Country
  • Select country
  • Belarus
  • Brazil
  • Bulgaria
  • China
  • Denmark
  • Estonia
  • Finland
  • Iceland
  • India
  • International
  • Latvia
  • Lithuania
  • Mexico
  • Multilateral
  • Netherlands
  • Norway
  • Philippines
  • Poland
  • Russia
  • Serbia
  • Slovakia
  • South Africa
  • Sweden
  • Thailand
  • Ukraine
  • Uruguay
  • Vietnam
Customer
Special features
Category A projects
Climate change mitigation
Maritime environment
Arctic facility
Environmental Bond financing
COVID-19 response

Click to open a larger map

Date Customer Loan agreed Summary  
3 Dec 2019

Fjord1 ASA

(Norway)

EUR 73.8 million

Environmental bond financing

Acquisition of twelve hybrid electric ferries.

28 Nov 2019

Sogn og Fjordane Energi AS

(Norway)

EUR 30 million

Environmental bond financing

Construction of a 47MW hydropower plant in Østerbø, Norway.

26 Nov 2019

Demant A/S

(Denmark)

EUR 60.2 million

Research and development costs for audiological devices and technology in 2019.

26 Nov 2019

Nordic Environment Finance Corporation (NEFCO)

(Finland)

EUR 25 million

Loan programme for on-lending to environmental projects in non-member countries, primarily Ukraine.

20 Nov 2019

AS Tallinna Vesi

(Estonia)

EUR 37.5 million

Environmental bond financing

Upgrading freshwater supply and wastewater management infrastructure networks in Tallinn.

15 Nov 2019

Helgeland Sparebank

(Norway)

EUR 29.73 million

Climate: 50%

Arctic Facility: 50%

Loan programme for onlending to SMEs and environmental projects in northern Norway.

14 Nov 2019

City of Varberg

(Sweden)

EUR 62.23 million

Environmental bond financing

Investments in municipal water and wastewater infrastructure in Varberg, Sweden.

8 Nov 2019

Vectura AB

(Sweden)

EUR 93.5 million

Construction of a green building dedicated to life science in Stockholm.

7 Nov 2019

Tampereen seudun keskuspuhdistamo Oy

(Finland)

EUR 150 million

Baltic Sea: 100%

Constructing a new wastewater treatment plant to be built in Sulkavuori, in the city of Tampere, Finland

Category A project

5 Nov 2019

Municipality of Örebro

(Sweden)

EUR 55.8 million

Upgrading fresh water supply and wastewater management infrastructure in Örebro, Sweden

 

Customer testimonials

Read what our customers say about cooperating with NIB

Read more