19 Jun 2013 Senaatti-kiinteistöt (Finland)
Investments in governmental offices and a research building.
  • Infrastructure, transportation and telecom
18 Jun 2013 Säästöpankki Optia (Finland)
Loan programme for onlending to SME investments and environmental projects.
  • Financial institutions and SMEs
14 Jun 2013 Helgeland Veiutvikling AS (Norway)
Construction of a 35-kilometre road and an 11-kilometre tunnel in northern Norway
  • Infrastructure, transportation and telecom
12 Jun 2013 AB Electrolux (Sweden)
Research and development activities in 2012-2015.
7 Jun 2013 City of Rovaniemi (Finland)
Financing the city of Rovaniemi's investments in road infrastructure
  • Infrastructure, transportation and telecom
21 May 2013 VAS Latvijas Dzelzcels (Latvia)
Construction of a second track on a 52-kilometre section of the east-west railway corridor in Latvia.
  • Infrastructure, transportation and telecom
14 May 2013 DNB Bank ASA (Sweden)
Financing of DNB Bank’s onlending for the construction of the Jädraås wind farm outside Gävle, Sweden.
  • Energy and environment
13 May 2013 Vimmerby Energi & Miljö (Sweden)
Construction of a bio-fuelled combined heat and power plant in Vimmerby, Sweden.
  • Energy and environment
29 Apr 2013 Suomen Hypoteekkiyhdistys (Finland)
Loan programme for financing small-scale environmental investments of households and housing companies.
  • Financial institutions and SMEs
8 Apr 2013 AS Tallinna Sadam (Estonia)
Acquisition of an ice-breaker for the harbour of Tallinn.
  • Infrastructure, transportation and telecom
22 Mar 2013 NorgesGruppen ASA (Norway)
Financing of a regional distribution hub in Norway
12 Mar 2013 Klaipeda State Seaport Authority (Lithuania)
Reconstruction of quays and construction of piers and a terminal for passenger and cargo ferries, capital dredging and widening of the port’s navigation channel.
  • Infrastructure, transportation and telecom
1 Mar 2013 Helsinki Region Environmental Services Authority (Finland)
Financing of the development of wastewater treatment in the Helsinki metropolitan region.
Environmental facility: BASE 50%
21 Feb 2013 Sparbanken Öresund AB (Sweden)
Loan programme for onlending to SMEs and households for small-scale environmental investments.
  • Financial institutions and SMEs
19 Feb 2013 Chr. Hansen Holding A/S (Denmark)
Financing for R&D programme developing natural ingredients solutions.
13 Feb 2013 Wärtsilä Corporation (Finland)
Financing R&D programme for engine development.
1 Feb 2013 Aalto University Properties Ltd (Finland)
To finance construction and renovation of two university buildings.
  • Infrastructure, transportation and telecom
17 Jan 2013 Helsingin Yliopistokiinteistöt Oy (Finland)
Construction and renovation of laboratories at the University of Helsinki, Finland
9 Jan 2013 Kemijoki Oy (Finland)
To refurbish and upgrade Kemijoki Oy’s hydropower facilities in Finland.
  • Energy and environment
Year 2013    
14 Dec 2012 Tractebel Energia S.A. (Brazil)
Construction of wind farms in the north-eastern region of Brazil.
  • Energy and environment
12 Dec 2012 SEB Leasing Oy (Finland)
Acquisition of a school centre to be leased to the city of Tampere.
  • Infrastructure, transportation and telecom
11 Dec 2012 Kraftnät Åland Ab (Finland)
Financing of a 160-kilometre subsea cable between the Åland Islands and Finland.
  • Energy and environment
10 Dec 2012 Republic of Belarus (Belarus)
Upgrade of the wastewater treatment plants in the cities of Grodno and Brest in western Belarus.
  • Energy and environment
Environmental facility: BASE 100%
4 Dec 2012 Territorial Generating Company No 1 (Russia)
Renovation of two hydropower plants along the river Vuoksi in Northwest Russia.
  • Energy and environment
3 Dec 2012 Bank Gospodarstwa Krajowego (Poland)
Construction of a 37-kilometre stretch of the A1 motorway in central Poland.
  • Infrastructure, transportation and telecom
27 Nov 2012 Volvo Treasury AB (Sweden)
Investment in Volvo Group’s R&D to improve fuel efficiency to comply with forthcoming European emission regulations.
16 Oct 2012 FLSmidth & Co. A/S (Denmark)
R&D programme focusing on the development of innovative products as well as more efficient production processes for the cement and mineral industries.
Environmental facility: CLEERE 100%
11 Oct 2012 SKF AB (Sweden)
R&D programme 2012-2015 to further reduce friction in SKF’s bearings.
  • Energy and environment
Environmental facility: CLEERE 100%
8 Oct 2012 Lyse Energi AS (Norway)
Upgrade of electricity grid in Rogaland county, in southern Norway
  • Energy and environment
Environmental facility: CLEERE 10%
28 Sep 2012 Tele2 AB (Sweden)
Expansion of mobile telecommunications network in Norway.
  • Infrastructure, transportation and telecom
25 Sep 2012 Getinge AB (Sweden)
R&D investments in Solna, Sweden
19 Sep 2012 Agder Energi AS (Norway)
Increase of hydropower capacity in Norway
  • Energy and environment
Environmental facility: CLEERE 100%
1 Aug 2012 Växjö Energi AB (Sweden)
Investment in a new bio-fuelled combined heat and power plant.
  • Energy and environment
Environmental facility: CLEERE 100%
25 Jul 2012 Sparebank 1 SMN (Norway)
Loan programme to finance new hydropower projects and upgrade existing plants
  • Financial institutions and SMEs
Environmental facility: CLEERE 100%
16 Jul 2012 Ericsson (Sweden)
Financing R&D investments in mobile communications technologies
  • Infrastructure, transportation and telecom
9 Jul 2012 Petrozavodsk Communal Utilities Systems (Russia)
Rehabilitation and improvements of facilities for wastewater treatment in the city of Petrozavodsk, northwest Russia.
  • Energy and environment
Environmental facility: CLEERE 50%,
BASE 50%
9 Jul 2012 City of Vilnius (Lithuania)
Financing the city’s annual investment programme, including street reconstruction, upgrading infrastructure for sludge and wastewater treatment, as well as improving energy efficiency in public buildings.
  • Infrastructure, transportation and telecom
Environmental facility: CLEERE 59%,
BASE 24%
4 Jul 2012 Region Skåne (Sweden)
Purchase of up to 49 trains to be leased to Region Skåne. The new trains have energy recovery technology and offer improved traveller comfort, including better facilities for people with physical disabilities.
  • Infrastructure, transportation and telecom
Environmental facility: CLEERE 50%,
BASE 50%
29 Jun 2012 Ringkjøbing Landbobank A/S (Denmark)
Loan programme for financing wind energy projects in Denmark.
  • Financial institutions and SMEs
Environmental facility: CLEERE 100%
25 Jun 2012 NCC Treasury AB (Sweden)
Construction of energy-efficient office buildings in Finland and Sweden.
Environmental facility: CLEERE 100%
25 Jun 2012 Greenland Self Rule Government (Denmark)
Construction of a hydropower plant on the west coast of Greenland.
  • Energy and environment
Environmental facility: CLEERE 100%
25 Jun 2012 OJSC MegaFon (Russia)
Upgrading of the company's networks in the Moscow region and other regions of Russia.
  • Infrastructure, transportation and telecom
12 Jun 2012 AB Lietuvos gelezinkeliai (Lithuania)
Infrastructure investment programme that includes the renewal and modernisation of parts of Trans-European rail corridors in Lithuania.
  • Infrastructure, transportation and telecom
Environmental facility: CLEERE 100%
11 Jun 2012 Haldor Topsøe A/S (Denmark)
R&D programme developing catalysts and technologies for energy efficient processes used for removing harmful emissions, production of clean fuels and power generation.
31 May 2012 Tranås Stadshus AB (Sweden)
Financing of a new biofuel-based boiler in the district heating power plant in Tranås, Sweden.
  • Energy and environment
Environmental facility: CLEERE 100%
25 May 2012 SJ AB (Sweden)
Purchase of 20 new SJ-3000 high-speed trains
  • Infrastructure, transportation and telecom
Environmental facility: CLEERE 100%
14 May 2012 Kymenlaakson Sähköverkko Oy (Finland)
Financing implementation of remote reading of energy consumption in South-East Finland
  • Energy and environment
Environmental facility: BASE 100%
10 May 2012 Axis Bank Limited (India)
Construction of wind turbine parks with a total capacity of 300 MW in the states of Tamil Nadu, Andhra Pradesh and Gujarat in India.
  • Financial institutions and SMEs
Environmental facility: CLEERE 100%
2 May 2012 TINE SA (Norway)
Expansion of the dairy's plant in Kalbakken, Oslo, Norway.
Environmental facility: CLEERE 100%
26 Apr 2012 Elering AS (Estonia)
Construction of a 330 kV transmission line in southern Estonia.
  • Energy and environment
20 Apr 2012 E-CO Energi AS (Norway)
Financing investments in hydropower plants.
  • Energy and environment
Environmental facility: CLEERE 70%
19 Apr 2012 Skanska Financial Services AB (Sweden)
Construction of four green office buildings in Poland meeting the requirements of the LEED and EU Green Building standards.
Environmental facility: CLEERE 100%
18 Apr 2012 AB Transitio (Sweden)
Purchase of 10 new train sets for passenger transportation in Sweden.
  • Infrastructure, transportation and telecom
Environmental facility: CLEERE 100%
4 Apr 2012 Boliden Mineral AB (Sweden)
Expansion of the Garpenberg zinc, silver and lead mine in Dalarna, Sweden, to increase ore production.
31 Jan 2012 Spendrups Bryggeri AB (Sweden)
Expansion of the company’s largest brewery to increase energy efficiency.
Environmental facility: CLEERE 10%
30 Jan 2012 Vaskiluodon Voima Oy (Finland)
Financing the construction of a gasification-based bioenergy plant.
  • Energy and environment
Environmental facility: CLEERE 100%
30 Jan 2012 Government through Ministry of Finance (China)
Financing of projects fulfilling NIB’s mandate within various sectors.
30 Jan 2012 Government through Ministry of Finance (China)
Financing of projects fulfilling NIB’s mandate within various sectors in rural areas.
11 Jan 2012 Ramboll Gruppen A/S (Denmark)
Acquisition of the British consulting company, Gifford.
Year 2012    
21 Dec 2011 Elisa Corporation (Finland)
Expansion of 3G broadband networks in smaller towns and rural areas of Finland.
  • Infrastructure, transportation and telecom
20 Dec 2011 Østfold Energi (Norway)
Financing investments in renewable energy production such as wind energy, hydropower and district heating.
  • Energy and environment
Environmental facility: CLEERE 60%
19 Dec 2011 Power Grid Corporation of India Ltd. (India)
Construction of an 1,900-kilometre high-voltage direct current (HVDC) bi-pole line and HVDC terminals through transfer from hydropower stations in northeast India to the areas of the country experiencing a power deficit, in particular the northern and western regions.
  • Energy and environment
19 Dec 2011 Thy-Mors Energi Elnet A/S (Denmark)
Investments in the electricity distribution network to improve operating security.
  • Energy and environment
8 Dec 2011 Fingrid Oyj (Finland)
Construction of a 170-kilometre electricity interconnection between Estonia and Finland, Estlink 2.
  • Energy and environment
8 Dec 2011 Tieyhtiö Valtatie 7 Oy (Finland)
Financing the E18 Koskenkylä–Kotka Motorway PPP project.
  • Infrastructure, transportation and telecom
1 Dec 2011 Municipality of Gävle (Sweden)
Financing of infrastructure projects in the port of Gävle.
  • Infrastructure, transportation and telecom
4 Nov 2011 Inter-American Investment Corporation (International)
Loan programme for financing projects of mutual interest complying with NIB’s mandate.
  • Financial institutions and SMEs
Environmental facility: CLEERE 100%
19 Oct 2011 Statnett SF (Norway)
Construction of a new subsea cable, Skagerrak 4, between Norway and Denmark and an upgrade of the existing subsea cable crossing the Oslofjord.
  • Energy and environment
Environmental facility: CLEERE 60%
17 Oct 2011 Avinor AS (Norway)
Construction of the new Terminal 2 at Oslo Airport Gardermoen.
  • Infrastructure, transportation and telecom
13 Oct 2011 Sparebanken Vest AS (Norway)
Loan programme to finance the construction of new hydropower projects and the upgrading of existing hydropower plants.
  • Financial institutions and SMEs
Environmental facility: CLEERE 100%
6 Oct 2011 City of Vilnius (Lithuania)
Municipal investment programme, including road building projects, energy efficiency and municipal transport fleet renewal projects.
  • Infrastructure, transportation and telecom
Environmental facility: CLEERE 49%
20 Sep 2011 DONG Energy A/S (Denmark)
Financing the construction of the Anholt offshore wind farm in Denmark.
  • Energy and environment
Environmental facility: CLEERE 100%
20 Sep 2011 Akershus Energi AS (Norway)
Upgrade of two hydroelectrical power plants and one district heating plant in Akershus county.
  • Energy and environment
Environmental facility: CLEERE 100%
6 Sep 2011 Cargotec Corporation (Finland)
Acquisition of terminal operating system provider Navis.
30 Aug 2011 YES Bank Limited (India)
Loan programme for financing projects within various sectors fulfilling NIB’s mandate.
  • Financial institutions and SMEs
26 Aug 2011 Bonnier AB (Sweden)
Investments in new and modern newsprint machinery in Bonnier Group’s printing company, Bold’s, plant near Stockholm.
Environmental facility: CLEERE 100%
25 Aug 2011 Gazprombank (Open Joint-stock Company) (Russia)
Onlending to energy-efficiency projects in Russia.
  • Financial institutions and SMEs
Environmental facility: CLEERE 70%
24 Aug 2011 SEB Leasing Oy (Finland)
Financing the acquisition of equipment to be leased to Turun Seudun Vesi Oy for an artificial recharge aquifer project in the Turku region in Finland.
  • Energy and environment
23 Aug 2011 Nortura SA (Norway)
Construction of a new slaughterhouse in Malvik, central Norway, which will replace older slaughterhouses and help reduce energy and water consumption.
Environmental facility: CLEERE 100%
23 Jun 2011 Lantmännen ekonomisk förening (Sweden)
Financing for increased production at an ethyl alcohol plant in Norrköping in order to meet the growing demand for ethanol as a replacement for gasoline.
Environmental facility: CLEERE 100%
22 Jun 2011 Oulun Energia Oy (Finland)
Acquisition of equipment to be leased from SEB Leasing Oy for the construction of a new waste incineration plant.
  • Energy and environment
Environmental facility: CLEERE 100%
20 Jun 2011 Pohjola Bank plc (Finland)
Onlending to housing companies, SMEs and large corporations for projects in the areas of energy efficiency and wastewater treatment.
  • Financial institutions and SMEs
Environmental facility: CLEERE 70%,
BASE 30%
20 Jun 2011 The University of Helsinki Funds (Finland)
Financing of Finland’s largest academic library in Helsinki city centre.
Environmental facility: CLEERE 100%
13 Jun 2011 SEB Leasing Oy (Finland)
Acquisition of construction equipment to be leased to Porvoon Energia Oy for a combined heat and power plant in South-East Finland.
  • Energy and environment
Environmental facility: CLEERE 100%
9 Jun 2011 Black Sea Trade and Development Bank (International)
Onlending to projects that mostly serve the purpose of reducing greenhouse gas emissions in the BSTDB’s member countries.
  • Financial institutions and SMEs
Environmental facility: CLEERE 70%
6 Jun 2011 Turun Seudun Vesi Oy (Finland)
Financing an artificial recharge aquifer project for water supply in the Turku region in Finland.
  • Infrastructure, transportation and telecom
30 May 2011 Bank Ochrony Srodowiska (Poland)
Environmental loan programme for projects promoting renewable energy solutions, energy-efficiency measures and wastewater treatment systems.
  • Financial institutions and SMEs
3 May 2011 Gabrielsberget Nord Vind AB (Sweden)
Wind farm project with a total capacity of 46 MW in the province of Västerbotten in northern Sweden.
  • Energy and environment
Environmental facility: CLEERE 100%
20 Apr 2011 VTB Bank (Russia)
Onlending to projects primarily within the sectors of energy efficiency, transport and logistics with the emphasis on projects located in Northwest Russia.
  • Financial institutions and SMEs
19 Apr 2011 Skandinaviska Enskilda Banken AB (Sweden)
Investment loan for financing part of the purchase price of 18 trains to be leased to Swedish rail company AB Transitio.
  • Infrastructure, transportation and telecom
Environmental facility: CLEERE 50%,
BASE 50%
4 Apr 2011 Fortum Oyj (Finland)
Construction of a waste-fuelled combined heat and power plant in Klaipeda, Lithuania.
  • Energy and environment
Environmental facility: CLEERE 100%
1 Apr 2011 Länsimetro Oy (Finland)
Financing the building of the metro line from Helsinki to Espoo.
  • Infrastructure, transportation and telecom
Environmental facility: CLEERE 100%
31 Mar 2011 Aircel Limited (India)
Development of 3G mobile communications and broadband wireless access networks in India.
  • Infrastructure, transportation and telecom
28 Mar 2011 Neste Oil Corporation (Finland)
R&D projects aimed at extending the range of raw materials that Neste Oil uses for the production of renewable diesel.
Environmental facility: CLEERE 100%
24 Mar 2011 Gabrielsberget Syd Vind AB (Sweden)
Wind farm project with a total capacity of 46 MW in the province of Västerbotten in northern Sweden.
  • Energy and environment
Environmental facility: CLEERE 100%
22 Mar 2011 Infrastructure Development Finance Company Ltd (India)
Onlending to infrastructure projects that comply with NIB’s mandate.
  • Financial institutions and SMEs
17 Mar 2011 Skanska Financial Services AB (Sweden)
Investments in office buildings, built according to the Leadership in Energy and Environmental Design (LEED) and EU GreenBuilding certifications.
Environmental facility: CLEERE 100%
16 Mar 2011 Landsvirkjun (Iceland)
Construction of a new hydropower plant in Búðarháls, southern Iceland.
  • Energy and environment
7 Mar 2011 Nedbank Limited (South Africa)
Onlending for infrastructure and energy projects with an environmental benefit in southern Africa.
  • Financial institutions and SMEs
22 Feb 2011 The Bank of Greenland (Denmark)
Loan programme to finance the Bank of Greenland’s environmental loan facility for energy efficiency measures in private households.
  • Financial institutions and SMEs
Environmental facility: CLEERE 100%
16 Feb 2011 YIT Oyj (Finland)
Acquisition of German Caverion Gmbh, which offers building maintenance and operation services in Central Europe.
20 Jan 2011 Danish Crown A/S (Denmark)
Investments into fire prevention programmes in Danish Crown’s factories, as well as an upgrade of the company’s meat processing factory in Blans, Denmark.
Year 2011    
17 Dec 2010 Oulun Osuuspankki (Finland)
Onlending to private households, housing companies, SMEs and large corporations for projects in the areas of energy efficiency and wastewater treatment.
  • Financial institutions and SMEs
Environmental facility: CLEERE 60%,
BASE 40%
17 Dec 2010 Nedbank Limited (South Africa)
Onlending for infrastructure and energy projects with an environmental benefit in southern Africa.
  • Financial institutions and SMEs
15 Dec 2010 Greenland Self Rule Government (Denmark)
Construction of a new hydro power plant at Sisimuit on the west coast of Greenland.
  • Energy and environment
Environmental facility: CLEERE 100%
15 Dec 2010 Bulgarian Development Bank (Bulgaria)
Onlending to projects that comply with NIB’s mandate, mainly in the production of renewable energy.
  • Financial institutions and SMEs
Environmental facility: CLEERE 70%
10 Dec 2010 Norsk Hydro ASA (Norway)
Investments in the field of research and development, environment and the company's hydropower operations.
Environmental facility: CLEERE 100%
8 Dec 2010 Ringkjøbing Landbobank A/S (Denmark)
Loan programme earmarked for investments in wind power projects in Jutland, Denmark.
  • Financial institutions and SMEs
Environmental facility: CLEERE 100%
25 Nov 2010 Nokia Siemens Networks Oy (Finland)
Investment in a research and development project, aimed at integrating several wireless technologies into one—a Single RAN (radio access network). The Single RAN can be upgraded via remote software solutions, which will simplify the operation of mobile networks.
  • Infrastructure, transportation and telecom
24 Nov 2010 Finnish Fund for Industrial Cooperation Ltd (Finland)
Onlending to small and medium-sized companies for environmental projects.
  • Financial institutions and SMEs
Environmental facility: CLEERE 70%
26 Oct 2010 Government through Ministry of Finance (China)
General Loan Programme XIII to finance projects complying with NIB’s mandate within various sectors.
26 Oct 2010 Government through Ministry of Finance (China)
Loan programme to finance environmental projects complying with NIB’s mandate within various sectors and aimed at improving the environmental situation in China through pollution abatement and the application of environment-friendly technologies.
20 Oct 2010 Fingrid Oyj (Finland)
Construction of a 170-kilometre electricity interconnection between Estonia and Finland, Estlink 2.
  • Energy and environment
20 Oct 2010 Elering AS (Estonia)
Construction of a 170-kilometre electricity interconnection between Estonia and Finland, Estlink 2.
  • Energy and environment
13 Oct 2010 Banco Nacional de Desenvolvimento Economico e Social (Brazil)
General loan programme for on-lending to projects fulfilling NIB's mandate within various sectors.
  • Financial institutions and SMEs
7 Oct 2010 Vestas Wind Systems A/S (Denmark)
R&D programme focusing on the development of a new type of 3 MW wind turbine for low and medium wind regimes.
  • Energy and environment
Environmental facility: CLEERE 100%
6 Oct 2010 Kemira Oyj (Finland)
Financing of R&D at the Center of Water Efficiency Excellence.
16 Sep 2010 City of Vilnius (Lithuania)
Construction of the city’s western bypass road and sludge treatment plant as well as renovation of schools.
  • Infrastructure, transportation and telecom
Environmental facility: CLEERE 35%,
BASE 10%
15 Sep 2010 Boliden Mineral AB (Sweden)
Expansion of the metal company’s electronic scrap recycling plant in Rönnskär, Sweden.
14 Sep 2010 Bons Ventos Geradora de Energia S.A. (Brazil)
Construction of four wind parks with a total power generation capacity of 157.5 MW in Brazil.
  • Energy and environment
Environmental facility: CLEERE 100%
31 Aug 2010 TINE SA (Norway)
Construction of a new dairy facility in southern Norway, which will replace four older dairies in the same region.
Environmental facility: CLEERE 100%
25 Aug 2010 SSAB AB (Sweden)
Expansion of one of the company’s plants in Sweden, to increase the volume of high strength steel products.
21 Jul 2010 Government through Ministry of Finance (Vietnam)
Loan Programme for onlending to projects within various sectors using modern, state-of-the art technologies and equipment supplied by companies from NIB’s member countries.
  • Financial institutions and SMEs
6 Jul 2010 Banco Itaú BBA S.A. (Brazil)
Loan programme for financing projects that are of mutual interests to Brazil and NIB’s member countries.
  • Financial institutions and SMEs
30 Jun 2010 Swedish Hospital Partners AB (Sweden)
Public-Private Partnership (PPP) project to design, build, finance and operate the New Karolinska Solna Hospital, in order to meet the future demands of specialised healthcare.
  • Infrastructure, transportation and telecom
24 Jun 2010 Lahti Energia Oy (Finland)
Construction of a gasification-based waste-to-energy plant in the city of Lahti in southern Finland.
  • Energy and environment
Environmental facility: CLEERE 100%
24 Jun 2010 Hafslund ASA (Norway)
Expansion and upgrade of the transmission grid in the Oslo region.
  • Energy and environment
Environmental facility: CLEERE 10%
17 Jun 2010 VAS Latvijas Dzelzcels (Latvia)
Investment programme for the renewal of the east-west railway corridor in 2010 to 2013.
  • Infrastructure, transportation and telecom
Environmental facility: CLEERE 100%
17 Jun 2010 Vattenfall AB (Sweden)
Upgrade of Vattenfall’s hydropower plants in the period 2006-2013. A major part of the task involves reducing the environmental impact of Vattenfall’s operations and utilising water resources more efficiently. The investments are mainly focused on the replacement of turbines, generators and transformers.
  • Energy and environment
Environmental facility: CLEERE 75%
16 Jun 2010 Rautaruukki Corporation (Finland)
Modernisation and reconstruction of the iron production and related environmental technology in the company’s steelworks in Raahe, Finland. The renewal will help modernise the manufacturing process so that it conforms to the latest environmental and technical standards.
Environmental facility: CLEERE 30%,
BASE 20%
16 Jun 2010 Nokia Siemens Networks Oy (Finland)
Investment in a research and development project, aimed at integrating several wireless technologies into one—a Single RAN (radio access network). The Single RAN can be upgraded via remote software solutions, which will simplify the operation of mobile networks.
  • Infrastructure, transportation and telecom
Environmental facility: CLEERE 50%
9 Jun 2010 AB Transitio (Sweden)
Financing the purchase of 35 new trains to be used by the Regional Public Transit Authorities (PTAs) to increase railway efficiency.
  • Infrastructure, transportation and telecom
Environmental facility: CLEERE 80%,
BASE 20%
27 May 2010 Fortum Oyj (Finland)
Investment programme for building up remote reading systems in energy metering.
  • Energy and environment
Environmental facility: CLEERE 100%
27 May 2010 Outotec Oyj (Finland)
Investment programme in research and development.
12 May 2010 Suomen Hypoteekkiyhdistys (Finland)
Onlending to households and housing companies for financing of projects that improve energy efficiency.
  • Financial institutions and SMEs
Environmental facility: CLEERE 100%
3 May 2010 Rajakiiri Oy (Finland)
Financing of the construction of a wind power park in Tornio in northern Finland.
  • Energy and environment
Environmental facility: CLEERE 100%
30 Apr 2010 Energa SA (Poland)
Modernisation and construction of low- and medium-voltage electricity networks.
  • Energy and environment
Environmental facility: CLEERE 40%
28 Apr 2010 Northern Capital Gateway LLC (Russia)
Reconstruction and expansion of the Pulkovo Airport in St. Petersburg.
  • Infrastructure, transportation and telecom
21 Mar 2010 Central American Bank for Economic Integration (CABEI) (International)
Loan programme focused mainly on renewable energy and public transport projects.
  • Financial institutions and SMEs
2 Mar 2010 UPM-Kymmene Oyj (Finland)
Investment in a new chemical recovery plant at a pulp and paper mill in Kymi, Finland.
29 Jan 2010 Green Cargo AB (Sweden)
Financing the upgrade of 42 electric and 62 diesel locomotives at Green Cargo.
  • Infrastructure, transportation and telecom
Environmental facility: CLEERE 50%
Year 2010    
23 Dec 2009 Volvo Treasury AB (Sweden)
R&D projects in different units within the Volvo Group to develop new technologies for emissions reduction and hybrid technologies for city vehicles.
22 Dec 2009 Vestas Wind Systems A/S (Denmark)
R&D programme aimed at developing a wind turbine for low and medium wind regimes.
  • Energy and environment
Environmental facility: CLEERE 100%
18 Dec 2009 City of Vantaa (Finland)
Infrastructure investment programme for the reconstruction of a ring road and the road network of Vantaa.
  • Infrastructure, transportation and telecom
18 Dec 2009 Hafslund ASA (Norway)
Construction of a new 13 km long pipeline between two district heating networks in Oslo to enable better utilisation of the current waste-based heat production and an enlargement of the district heating networks in the capital city.
  • Energy and environment
Environmental facility: CLEERE 100%
18 Dec 2009 FLSmidth & Co. A/S (Denmark)
Research and development programme aimed at creating more innovative products as well as more efficient production processes for the cement industry.
Environmental facility: CLEERE 50%
14 Dec 2009 Sparbanken Finn (Sweden)
Financing onlending for small-scale environmental investments.
  • Financial institutions and SMEs
Environmental facility: CLEERE 50%,
BASE 50%
10 Dec 2009 DNA Ltd (Finland)
Expansion of 3G and broadband networks.
  • Infrastructure, transportation and telecom
10 Dec 2009 Novgorod Vodokanal (Russia)
Construction of a raw-water pumping station as well as the rehabilitation of drinking water and sewage networks in the city of Novgorod in Northwest Russia.
  • Energy and environment
Environmental facility: CLEERE 75%,
BASE 25%
9 Dec 2009 Republic of Lithuania (Lithuania)
Loan programme for increasing energy efficiency of buildings in the public sector, including universities, schools, libraries, hospitals, as well as more than 300 private apartment buildings.
  • Energy and environment
Environmental facility: CLEERE 100%
7 Dec 2009 Lyse Energi AS (Norway)
Investments in electricity distribution networks and regional networks.
  • Energy and environment
1 Dec 2009 Ålandsbanken Abp (Finland)
Intermediary loan for onlending to small and medium-sized companies.
  • Financial institutions and SMEs
Environmental facility: CLEERE 50%
30 Nov 2009 Danisco A/S (Denmark)
R&D programmes to produce cellulosic-based bioethanol and bio-isoprene.
Environmental facility: CLEERE 50%
27 Nov 2009 NorgesGruppen ASA (Norway)
Expansion of a distribution hub outside Oslo.
23 Nov 2009 Ringkjøbing Landbobank A/S (Denmark)
Onlending to small and medium-sized enterprises for the construction of wind turbines in Denmark.
  • Financial institutions and SMEs
16 Nov 2009 Corporación Andina de Fomento (International)
Loan programme for financing projects of mutual interest to the member countries of NIB and CAF.
  • Financial institutions and SMEs
13 Nov 2009 Outokumpu Oyj (Finland)
Investments in a chrome mine in Kemi (extension of a loan signed in 2001).
  • Manufacturing and mining
3 Nov 2009 PVO-Vesivoima Oy (Finland)
Upgrading five hydropower plants, including the replacement of turbines and generators, and the modernisation of the automation system.
  • Energy and environment
Environmental facility: CLEERE 100%
26 Oct 2009 Helen Electricity Network Ltd. (Finland)
Investments in remote reading systems in energy metering.
  • Energy and environment
Environmental facility: CLEERE 100%
7 Oct 2009 Wärtsilä Oyj (Finland)
Acquisition of a ship design group Vik-Sandvik.
5 Oct 2009 Black Sea Trade and Development Bank (International)
Loan programme for financing projects of mutual interest to the member countries of NIB and the borrowing bank.
  • Financial institutions and SMEs
1 Sep 2009 City of Helsinki (Finland)
Long-term loan for the purchase of low-floor trams and metro cars.
  • Infrastructure, transportation and telecom
Environmental facility: CLEERE 100%
6 Jul 2009 Fingrid Oyj (Finland)
Upgrading Finland’s electricity transmission grid in order to accommodate the growing demand created by the wind power production in the country, develop the electricity market and maintain the security of supply.
  • Energy and environment
2 Jul 2009 Eidsiva Energi AS (Norway)
Construction of a waste incineration power plant in eastern Norway with an annual output capacity of 200 GWh of energy.
  • Energy and environment
Environmental facility: CLEERE 100%
26 Jun 2009 Mobile Telesystems OJSC (Russia)
An A/B loan has been provided for financing the expansion of the company’s 2G and 3G mobile network in Russia, Ukraine, Armenia and Turkmenistan.
  • Infrastructure, transportation and telecom
24 Jun 2009 Novozymes A/S (Denmark)
Research and development in enzyme technology for bio-fuel production.
Environmental facility: CLEERE 100%
9 Jun 2009 AB Lietuvos gelezinkeliai (Lithuania)
Modernisation of the Lithuanian segments of the Trans-European rail corridors connecting Ukraine and Belarus to Baltic harbours as well as the Tallinn–Riga–Kaliningrad corridor.
  • Infrastructure, transportation and telecom
Environmental facility: CLEERE 100%
20 May 2009 City of Vilnius (Lithuania)
Investment programme including the construction of a bypass road south of the city, the reconstruction of streets, as well as the upgrading of the public transport fleet.
  • Infrastructure, transportation and telecom
Environmental facility: CLEERE 25%
20 May 2009 Vodokanal of St. Petersburg (Russia)
Construction of a pumping station in a sewage collection tunnel and the reconstruction of the Northern Wastewater Treatment Plant in St. Petersburg. The project will help close most of the remaining points where untreated wastewater effluent is now being directly discharged into the river Neva and the Baltic Sea.
  • Energy and environment
Environmental facility: BASE 100%
17 Apr 2009 VAS Latvijas Hipoteku un zemes banka (Latvia)
Onlending to projects carried out by small and medium-sized enterprises in Latvia.
  • Financial institutions and SMEs
9 Apr 2009 AS Tallinna Vesi (Estonia)
Investment programme for 2008–2010, including the maintenance and extension of the water supply and sewage networks.
  • Infrastructure, transportation and telecom
Environmental facility: BASE 50%
6 Apr 2009 SSAB (Sweden)
Environmental investments, including energy efficiency gains, improved handling of waste and better use of chemicals, at the company’s production plants in Oxelösund, Borlänge and Luleå.
Environmental facility: CLEERE 75%
3 Apr 2009 SJ AB (Sweden)
Financing for the purchase of 20 new high speed trains, replacing traditional style trains and increasing capacity at routes where capacity is a bottle neck during rush hours. This is assumed to lead to that SJ will increase its market share on behalf of air and road travel. An improvement from an environmental point of view.
  • Infrastructure, transportation and telecom
1 Apr 2009 Kemijoki Oy (Finland)
Upgrading and refurbishment of existing hydropower plants, which will enable the output of renewable and emission-free energy to increase by 100 GWh per year, or up 25% from the current level.
  • Energy and environment
Environmental facility: CLEERE 75%
31 Mar 2009 SKF AB (Sweden)
Investment in product R&D with a focus on the reduction of friction and wear as well as improving energy efficiency.
Environmental facility: CLEERE 50%
30 Mar 2009 Indian Renewable Energy Development Agency Ltd. (India)
Loan programme to finance renewable energy projects in India.
  • Financial institutions and SMEs
20 Mar 2009 Rautaruukki Corporation (Finland)
Modernisation and reconstruction of the iron production and related environmental technology in company’s steelworks in Raahe, western Finland. The renewal will help bring the manufacturing process up to date with the latest environmental and technical standards.
Environmental facility: CLEERE 30%,
BASE 20%
13 Mar 2009 Empresa Brasileira de Telecomunicações S.A. (Brazil)
A/B loan for financing the expansion of the company’s wireless broadband and telecommunications infrastructure in Brazil including supplies of state-of-the-art telecom network technology from Nordic suppliers.
  • Infrastructure, transportation and telecom
10 Mar 2009 Lassila & Tikanoja Oyj (Finland)
Reconstruction and expansion of a recycling plant in Kerava.
  • Energy and environment
2 Mar 2009 Stockmann Oyj Abp (Finland)
Acquisition of Lindex, a major fashion chain in northern Europe, aimed at broadening Stockmann’s international business.
20 Jan 2009 YIT Oyj (Finland)
Acquisition of Austrian MCE AG’s building system service business in Germany, Austria, Poland, the Czech Republic, Hungary and Romania.
Year 2009    
22 Dec 2008 UAB Vilniaus vandenys (Lithuania)
Construction of a sludge treatment facility at a wastewater treatment plant in Vilnius, the capital of Lithuania. The facility will produce biogas to be utilised in a combined heat and power plant, and granules for use in covering landfill areas, as fertiliser, or as fuel for incineration plants.
Environmental facility: CLEERE 80%,
BASE 20%
19 Dec 2008 E.ON Sverige AB (Sweden)
Financing the Rødsand II wind farm in Denmark.
  • Energy and environment
Environmental facility: CLEERE 100%
12 Dec 2008 Gdansk Transport Company S.A. (Poland)
Construction of the 62-kilometre Phase 2 of the A1 motorway in Poland. By late 2011, a new dual-carriage motorway will link the Baltic Sea harbour city of Gdansk with the city of Torun in central Poland. A1 is part of Trans-European Corridor No 6, important for Scandinavian countries in improving transport connections to central and southern Europe.
  • Infrastructure, transportation and telecom
11 Dec 2008 Rettig Group (Finland)
Expansion of the company’s indoor climate comfort goods and equipment manufacturing facilities in Poland and Ireland.
24 Nov 2008 Orkla ASA (Norway)
Financing of a high-grade silicon metal factory for the solar cell industry. The new production process consumes significantly less energy than traditional methods, lowering production costs as well as air and water emissions.
Environmental facility: CLEERE 25%
18 Nov 2008 Moventas Oy (Finland)
An extension of the EUR 40 million investment loan agreed on 17 March 2008 for a new wind turbine gear manufacturing facility in Finland and an assembly plant in the US.
  • Energy and environment
12 Nov 2008 Wärtsilä Corporation (Finland)
Construction of a new spare parts distribution centre in the Netherlands. Centralising the spare parts logistics will help Wärtsilä strengthen its international customer service.
31 Oct 2008 Bank for Development and Foreign Economic Affairs (Russia)
Construction of a gas-fuelled heat and power plant for securing the power supply to the city of Moscow.
  • Financial institutions and SMEs
27 Oct 2008 Finnair Oyj (Finland)
Acquisition of an Airbus 340-300 E aircraft, as part of an investment programme for expanding the fleet.
  • Infrastructure, transportation and telecom
20 Oct 2008 Latvenergo A/S (Latvia)
Modernisation of the company’s generating capacity, in particular hydropower plants on the river Daugava, as well as rehabilitation and energy efficiency investments in transmission and distribution networks.
  • Energy and environment
Environmental facility: CLEERE 25%
29 Sep 2008 Keravan Lämpövoima Oy (Finland)
Construction of a new multi-fuelled, combined heat and power plant in the town of Kerava, southern Finland. Once in operation in late 2009, the new plant will help reduce the import of gas for fuelling the existing power plant in the town.
  • Energy and environment
24 Sep 2008 Posten Norge AS (Norway)
Construction of a new central post terminal on the outskirts of the capital city Oslo. The project is part of the overall strategy to increase efficiency of the post handling in Norway.
17 Sep 2008 AB Rytų Skirstomieji Tinklai (Lithuania)
Investment programme, including the reconstruction and construction of transformer substations and distribution points in the electricity distribution network in eastern Lithuania, including Vilnius.
  • Energy and environment
4 Sep 2008 Government through Ministry of Finance (China)
NIB’s 12th General Loan Programme to finance projects of mutual interest in various sectors of the country’s economy.
4 Sep 2008 Government through Ministry of Finance (China)
NIB’s 3rd Rural Area Loan Programme to finance projects of mutual interest in various sectors in rural areas in China.
2 Sep 2008 DONG Energy A/S (Denmark)
Financing of the Horns Rev II windmill farm off the west coast of Denmark in the North Sea.
  • Energy and environment
Environmental facility: CLEERE 100%
18 Aug 2008 IKEA Capital B.V. (Netherlands)
Investments in five new and relocated IKEA stores in Sweden.
8 Aug 2008 SN Aboitiz Power Benguet (Philippines)
Acquisition and rehabilitation of Ambuklao and Binga hydropower plants in the Philippines.
  • Energy and environment
Environmental facility: CLEERE 25%
1 Aug 2008 ZAO Atlas Copco (Russia)
Financing of new premises in Moscow, Russia.
16 Jul 2008 Industrial Union of Donbass (Ukraine)
Installation of a combined cycle gas turbine for a power plant at the Alchevsk steelworks in Ukraine. The turbine will generate electricity by using gases which are by-products of the steel production. As a result, the steelworks will be almost self-sufficient in electricity supply.
Environmental facility: CLEERE 100%
3 Jul 2008 Eqvitec Mezzanine Fund III (Finland)
Investment into the Eqvitec Mezzanine Fund III for onlending as mezzanine loans to Nordic small and medium-sized enterprises primarily in the technology, industrial product and services sectors.
  • Financial institutions and SMEs
2 Jul 2008 JSC State Export-Import Bank of Ukraine (Ukraine)
Loan programme for financing, in particular, environmental projects in the field of energy efficiency, promoting the reduction of harmful emissions affecting NIB’s member countries.
  • Financial institutions and SMEs
Environmental facility: CLEERE 100%
1 Jul 2008 Oi (Telemar Norte Leste S.A.) (Brazil)
A/B loan for financing the expansion of the company’s 2G and 3G mobile networks in the São Paulo region of Brazil.
  • Infrastructure, transportation and telecom
27 Jun 2008 Outokumpu Oyj (Finland)
Investments in the group’s stainless steel plant in Avesta, Sweden. The investment will help increase the annual finished product output capacity of the plant from the current 250,000 tonnes to some 650,000 tonnes. This will allow boosting the share of high-value-added products in the group’s sales.
25 Jun 2008 Elisa Oyj (Finland)
Investment programme aimed at building up and expanding the 3G mobile telecommunications network and increasing the capacity of the fixed-line broadband network.
  • Infrastructure, transportation and telecom
24 Jun 2008 Citycon Oyj (Finland)
Development of a shopping centre in Stockholm, Sweden.
11 Jun 2008 Djurslands Bank A/S (Denmark)
Onlending to small and medium-sized enterprise projects for the construction of new production facilities, expanding windmill farms, acquiring new trucks for haulage contractors and establishing district heating facilities for clients in Denmark.
  • Financial institutions and SMEs
10 Jun 2008 Boliden AB (Sweden)
Expansion of the Aitik copper mine in northern Sweden. The investment project includes the construction of a new concentrator that will double the annual ore production capacity to 36 million tonnes.
9 Jun 2008 Agder Energi AS (Norway)
Investments in the production and distribution of electricity, the development of bioenergy-based power production and the expansion of the regional thermal energy distribution grid in southern Norway.
  • Energy and environment
Environmental facility: CLEERE 25%
30 May 2008 Sampo Pankki Oyj (Finland)
Onlending to private households, farms and small and medium- sized enterprises in order to finance small-scale environmental projects.
  • Financial institutions and SMEs
Environmental facility: CLEERE 25%,
BASE 75%
29 May 2008 Aktia Säästöpankki Oyj (Finland)
Onlending to private households, farms and small and medium- sized enterprises in order to finance small-scale environmental projects.
  • Financial institutions and SMEs
Environmental facility: CLEERE 25%,
BASE 75%
28 May 2008 Danish Crown Livsmedel AB (Denmark)
Acquisition of slaughterhouses and meat processing plants run by Swedish KLS Livsmedel Ekonomisk Förening and Ugglarps Group and the construction of a new facility for meat processing and packaging in Sweden.
27 May 2008 Sparebanken Øst (Norway)
Onlending for infrastructure development as well as small and medium-sized enterprise projects in south-eastern Norway.
  • Financial institutions and SMEs
26 May 2008 DIBA Bank A/S (Denmark)
Onlending for projects of small and medium sized enterprises in southern and central Zealand as well as on the island of Bornholm.
Environmental facility: CLEERE 25%
20 May 2008 Nordic Mezzanine Group (Finland)
Investment into the Nordic Mezzanine Fund III for onlending as mezzanine loans primarily to Nordic small and medium-sized enterprises.
20 May 2008 SKF AB (Sweden)
Financing the company’s investments in research and development, including the development of new products and increasing the efficiency of production processes.
Environmental facility: CLEERE 50%
20 May 2008 SKF AB (Sweden)
Construction of a greenfield factory for the manufacture of large-sized bearings in India.
19 May 2008 Atlas Copco AB (Sweden)
Financing Atlas Copco Group’s customer finance exposure, which is a key factor in increasing export sales and, therefore, strengthening the company’s competitiveness.
29 Apr 2008 Husqvarna AB (Sweden)
Acquisition of the outdoor products operations within Komatsu Zenoah of Japan. Production is based in Japan and China.
25 Apr 2008 Banco Itaú BBA S.A. (Brazil)
Loan programme aimed at financing small and medium-sized enterprises’ projects involving NIB member country companies in Brazil.
  • Financial institutions and SMEs
25 Apr 2008 Vattenfall Treasury AB (Sweden)
Upgrade of Vattenfall’s hydropower plants in 2006–2013. A major part of the task involves reducing the environmental impact of Vattenfall’s operations and utilising water resources more efficiently. The investments are mainly focused on the replacement of turbines, generators and transformers.
  • Energy and environment
Environmental facility: CLEERE 75%
18 Apr 2008 Lenenergo (Russia)
Modernisation of Lenenergo’s electricity distribution network in St. Petersburg and the Leningrad Oblast.
  • Energy and environment
9 Apr 2008 Teollisuuden Voima Oy (Finland)
Upgrade of turbines and enhancement of safety and efficiency at the Olkiluoto nuclear power plant’s two reactors. The project includes retrofitting low-pressure steam turbines, renewing sea water pumps and replacing inner isolation valves in the main steam pipes.
  • Energy and environment
4 Apr 2008 Ahlstrom Corporation (Finland)
Acquisition of a controlling stake in a specialty paper mill in Jacarei, Brazil.
31 Mar 2008 Electrolux AB (Sweden)
Investments in four new plants in Poland. The investments cover four product groups: dryers, dishwashers, washing machines and cookers.
28 Mar 2008 Vimpelcom (Russia)
Development of the company’s GSM infrastructure in Russia and other CIS countries.
  • Infrastructure, transportation and telecom
25 Mar 2008 Svenska Cellulosa Aktiebolaget SCA (Sweden)
Investments in a new recovery boiler in Obbola, Umeå, and the expansion of an integrated pulp mill in Ortviken, Sundsvall.
Environmental facility: CLEERE 25%
19 Mar 2008 Carlsberg Breweries A/S (Denmark)
Acquisition of the British brewery company Scottish and Newcastle’s (S&N) share of the beer producer Baltic Beverages Holding and S&N’s operations in France, Greece, China and Vietnam.
17 Mar 2008 Moventas Oy (Finland)
Investment in a new wind turbine gear manufacturing facility in Jyväskylä in central Finland. The facility, due to be completed in late 2008, will double Moventas’s wind turbine and industrial gear production capacity.
  • Energy and environment
Environmental facility: CLEERE 25%
29 Feb 2008 Kemira International Finance B.V. (Netherlands)
Construction of a chemical plant at the site of Finnish Botnia’s pulp mill in Fray Bentos, Uruguay. Kemira is applying the best technology available, its own process know-how as well as Finnish and Swedish engineering and design to make the new plant fully compliant with EU environmental requirements.
26 Feb 2008 Tele Greenland A/S (Denmark)
Establishing a 4,500-kilometre two-leg marine fibre optic cable connecting Greenland with Iceland and Canada. The cable will safeguard the necessary telecommunications capacity between Greenland and the rest of the world for the next 25 years.
  • Infrastructure, transportation and telecom
15 Feb 2008 Fiskars Corporation (Finland)
Acquisition of the Finnish houseware design company Iittala Group Oy Ab, which will form a new European operation unit within the corporation and include certain parts of Fiskars’ own houseware division.
15 Feb 2008 NTPC Limited (India)
Equipment supplies for power plants necessary for the increase of the generation capacity.
  • Energy and environment
Year 2008    
20 Dec 2007 Lantmännen ekonomisk förening (Sweden)
Loan for the financing of Lantmännen ekonomisk förening's (Lantmännen) investment in a new ethyl alcohol production line in close connection to its existing plant in Norrköping.
17 Dec 2007 Yara International ASA (Norway)
For financing the acquisition of Finnish Kemira GrowHow from the Finnish state.
10 Dec 2007 Føroya Banki P/F (Denmark)
For onlending to small and medium-sized enterprises that invest in projects in various sectors of the Faroese economy.
  • Financial institutions and SMEs
10 Dec 2007 Baltic Beverage Holding AB (Sweden)
For financing the Baltic Beverage Holding's (BBH) investment programme, including a capacity increase at two of BBH's breweries: Slavutich in Ukraine and Sarbast Plus in Uzbekistan.
5 Dec 2007 Metso Corporation (Finland)
For financing acquisition of the pulping and power business of the Norwegian Aker Kvaerner Group in March 2006.
30 Nov 2007 Promsvyazbank (Russia)
For financing Promsvyazbank's (PSB) onlending for projects of mutual interest to NIB and PSB.
  • Financial institutions and SMEs
29 Nov 2007 Kaukaan Voima Oy (Finland)
For financing the construction of a new multi-fuelled power plant in Lappeenranta in eastern Finland.
  • Energy and environment
15 Nov 2007 Riga Psychiatric Clinic (Latvia)
For financing the development and modernisation of the Riga Psychiatric Clinic's (RPC) infrastructure, including the construction of a new building for patients, student training facilities, and the renovation of existing buildings.
  • Infrastructure, transportation and telecom
9 Nov 2007 Advanced Info Services Ltd. (Thailand)
For financing Advanced Info Services' (AIS) further expansion, capacity increase and upgrade of its existing GSM/GPRS mobile telephone network.
  • Infrastructure, transportation and telecom
17 Oct 2007 Landsnet hf. (Iceland)
For financing Landsnet's investments in new transmission infrastructure, including transmission lines and cables as well as new substations and extensions of existing ones.
  • Energy and environment
3 Oct 2007 AS Fortum Tartu (Estonia)
For financing a new combined heat and power plant to supply heat to the city of Tartu, Estonia, and electricity to third parties.
  • Energy and environment
1 Oct 2007 SN Aboitiz Power Inc. (Philippines)
To finance SN Aboitiz Power's (SNAP) acquisition and rehabilitation of the 360 MW Magat hydropower plant, which supplies energy to the Luzon electricity grid in the Philippines.
  • Energy and environment
26 Sep 2007 Svenska Cellulosa Aktiebolaget SCA (Sweden)
For financing a soda recovery boiler, set in operation in 2006, at Svenska Cellulosa Aktiebolaget SCA's pulp mill in Sundsvall, Sweden.
24 Sep 2007 Government through Ministry of Finance (China)
NIB's eleventh General Loan Programme of USD 100 million to the People's Republic of China will be used to finance projects of mutual interest in various sectors of the country's economy.
24 Sep 2007 Government through Ministry of Finance (China)
NIB's second Rural Area Loan Programme of USD 50 million, which will be used to finance projects of mutual interest in various sectors in rural areas in China.
17 Sep 2007 Siauliu Bankas AB (Lithuania)
For onlending to Lithuanian small and medium-sized enterprises (SMEs).
  • Financial institutions and SMEs
5 Sep 2007 Byggðastofnun (Institute of Regional Development) (Iceland)
To finance new projects in the rural areas of Iceland in 2007 and 2008.
  • Financial institutions and SMEs
29 Aug 2007 Latvenergo A/S (Latvia)
For financing Latvenergo's investment programme, which includes the rehabilitation of the transmission and distribution network and the modernisation of the heat and power plant TEC-2 in Riga, as well as other energy efficiency projects.
  • Energy and environment
15 Aug 2007 Valsts Nekustama Ipasuma Agentura (State Real Estate Agency) (Latvia)
For the renovation of a building to be rented out to the country's Ministry of Foreign Affairs.
17 Jul 2007 Sparekassen Thy (Denmark)
To finance small and medium-sized enterprises, primarily making environmental investments in the farming sector, including biogas plants and energy projects, for instance windmills.
  • Financial institutions and SMEs
12 Jul 2007 EBH Bank A/S (Denmark)
For onlending to small and medium-sized enterprises.
  • Financial institutions and SMEs
3 Jul 2007 Lánasjóður sveitarfélaga ohf. (Municipality Credit Iceland). (Iceland)
To co-finance 34 projects in Iceland's small rural municipalities within geothermal heating, waste disposal, water supply, and harbour facilities.
  • Financial institutions and SMEs
29 Jun 2007 Eidsiva Energi AS (Norway)
To finance a project under the Bank's competitiveness mandate.
  • Energy and environment
20 Jun 2007 Slovenska Zarucna a Rozvojova Banka (Slovak Guarantee and Development Bank) (Slovakia)
For financing Slovak small and medium-sized enterprises (SMEs) investing in Nordic/Baltic technologies, services or works or having Nordic/Baltic sponsors.
  • Financial institutions and SMEs
20 Jun 2007 Statnett SF (Norway)
For the financing of a 580-kilometre high-voltage power subsea cable, NorNed, between Feda in Norway and Eemshaven in the Netherlands.
  • Energy and environment
20 Jun 2007 DP Marketing International Limited (Brazil)
To Brazil's Bahia Pulp, which was earlier granted a project investment loan in the amount of USD 40 million.
14 Jun 2007 Atlas Copco AB (Sweden)
To finance the Atlas Copco Group's acquisition of Swedish Dynapac, a producer of compaction and paving equipment for the road construction market.
12 Jun 2007 Arla Foods (Denmark)
To finance Arla Foods' acquisition of a stake in the dairy business of Finland's Ingman Group.
8 Jun 2007 Getinge AB (Sweden)
To finance Getinge Group's acquisition of the British medical technology company Huntleigh Technology PLC will help strengthen Getinge's business structure and pursue the company's strategy of growth by acquiring operations in attractive segments.
7 Jun 2007 Bank Saint Petersburg (Russia)
To finance Bank Saint Petersburg's (BSP) onlending to subprojects eligible under NIB's Environmental Investment Loan programme.
  • Financial institutions and SMEs
24 May 2007 Telekom Srbija (Serbia)
For financing Telekom Srbija's (TS) investments in the development of its networks in Serbia and Montenegro.
  • Infrastructure, transportation and telecom
23 May 2007 Sandvik AB (Sweden)
For financing Sandvik AB's investment in a new steel hot rolling mill within the existing premises of the company's industrial area in Sandviken, central Sweden.
22 May 2007 Roskilde Bank A/S (Denmark)
For onlending to finance energy and environmental investments as well as investments of small and medium-sized enterprises.
  • Financial institutions and SMEs
16 Apr 2007 Akureyri Municipality (Iceland)
For onlending to Akureyri's energy company Norðurorka to finance three projects in geothermal district heating and power distribution in the Eyjafjörður area.
  • Energy and environment
12 Apr 2007 Schibsted Finans AS (Norway)
For Schibsted ASA's acquisition of selected activities of Trader Classified Media in Spain, France, Italy and Switzerland as well as some activities in Latin America.
11 Apr 2007 Fortum Oyj (Finland)
For financing the company's investment in a system for the automated measurement and control of the electricity consumption of its clients in the household and small business sectors in Sweden.
  • Energy and environment
4 Apr 2007 E.ON Sverige AB (Sweden)
For financing the replacement of 17,000 kilometres of weather-sensitive uninsulated overhead power distribution lines with underground cables to improve the ability of the power distribution grid in Sweden to resist hurricane winds.
  • Energy and environment
27 Mar 2007 Tallinna Trammi ja Trollikoondis AS (Estonia)
For financing the renewal of the public transport service rolling stock, including the acquisition of 23 new trolleybuses and 10 new tram cars.
  • Infrastructure, transportation and telecom
26 Mar 2007 Fingrid Oyj (Finland)
For financing the company's investment programme with the purpose of improving the capacity and efficiency of Finland's national electricity grid.
  • Energy and environment
23 Mar 2007 Ringkjøbing Bank A/S (Denmark)
For onlending to small and medium-sized enterprises for investments primarily in wind power, as well as environmentally friendly investments in the farming sector.
  • Financial institutions and SMEs
21 Mar 2007 Kemira International Finance B.V. (Netherlands)
For Kemira's acquisition of the wastewater treatment chemicals business of the US chemical company Cytec Industries Inc.
15 Mar 2007 Sparekassen Faaborg A/S (Denmark)
For further onlending for the activities of small and medium-sized enterprises in environmental farming, wind power production as well as the housing sector (environment and energy) and infrastructure (highway construction).
  • Financial institutions and SMEs
13 Mar 2007 Neste Oil Oyj (Finland)
For financing the company's investment in the production of renewable diesel based on vegetable oil or animal fat.
12 Mar 2007 RARIK ohf (Iceland)
To finance a part of RARIK's investments in the Lagarfoss hydro-power plant and to finance improvements in the distribution of electricity in the company's operational area.
  • Energy and environment
12 Mar 2007 Botnia S.A. (Uruguay)
For financing Botnia's investments in building a state-of-the-art, single-line bleached eucalyptus pulp mill in western Uruguay.
8 Mar 2007 Sparisjóður Reykjavíkur og nágrennis (Iceland)
For onlending to small and medium-sized enterprises among SPRON's customers with particular focus on projects in infrastructure and environmental improvements.
  • Financial institutions and SMEs
6 Mar 2007 Telia Sonera AB (Sweden)
For financing Telia Sonera's acquisition of the Norwegian broadband operator NextGenTel.
  • Infrastructure, transportation and telecom
6 Mar 2007 Husqvarna AB (Sweden)
For financing Husqvarna's activities in research and development.
1 Mar 2007 Norðoya Sparikassi (Denmark)
For financing Norðoya Sparikassi's (NS) onlending to Faroese small and medium-sized enterprises (SMEs), as well as infrastructure and environmental projects, including wind power parks.
  • Financial institutions and SMEs
28 Feb 2007 Trelleborg Treasury AB (Sweden)
For financing Trelleborg's acquisition of the engineering company CRP Group operating primarily in the UK and US.
21 Feb 2007 Nørresundby Bank A/S (Denmark)
For onlending to finance projects of small and medium-sized enterprises, including agricultural projects and cross-border environmental investments in establishing windmill parks.
  • Financial institutions and SMEs
12 Feb 2007 Aarhus Lokalbank Aktieselskab (Denmark)
For onlending to finance projects of small and medium-sized enterprises in the eastern part of Jutland.
  • Financial institutions and SMEs
7 Feb 2007 MDM Bank (Russia)
For financing MDM Bank's onlending to projects of mutual interest to NIB and MDM Bank.
  • Financial institutions and SMEs
1 Feb 2007 Stena Metall Finans AB (Sweden)
For financing Stena Metall's acquisition of the Danish recycling company Rødkærsbro A/S.
31 Jan 2007 Tallinna Lennujaam AS (Estonia)
For financing the rehabilitation of the airport's airside area and the upgrading of its passenger terminal.
  • Infrastructure, transportation and telecom
30 Jan 2007 DP Marketing International Limited (Brazil)
For financing the expansion of production capacity at Bahia Pulp, one of the world's leading producers of dissolving pulp, based in Camaçari, southern Brazil.
Year 2007    